Load testing of the overpass above the E-75 Highway, Section: Bukurevac - FYROM border, from km 965+996.51 to km 976+250.30, "Crossing No. 01", "Crossing No. 02" , "Crossing No. 03"

Realization: 2009

The bridges are constructed of simple precast prestressed beams and have the following spans: L=24.00+24.00 m.