Send to friend

Technical verification

Technical verification of Final design for installation of tourist signs on the territory of the town Kragujevac
Realization: 2011

Technical verification of Final design of the highway on Corridor 10,  section: "Horgoš" border crossing - Novi Sad, 106.9 km long
Realization: 2011

Technical verification of Final design of the highway on Corridor 10, section: Caričina dolina - Vladičin Han, 14.3 km long
Realization: 2011

Technical verification of Final design of traffic equipment and signalization at intersection of Drobilice road to limestone mine and Kosjerić road to marlstone mine
Realization: 2010

Technical verification of Final design of the highway on Corridor 10, section: Vladičin Han - Donji Neradovac, 26.3 km long
Realization: 2010

Technical verification of Final design of the E-763 highway, section: Lajkovac - Ljig, 23.9 km long
Realization: 2010

Technical verification of Final design of the highway on Corridor 10, section: Pirot (East) - Sukovo, 6.0 km long
Realization: 2010

Technical verification of Final designs for reconstruction and upgrading of air-conditioning and heating systems in the Palace of Serbia, Belgrade
Realization: 2010

Technical verification of Final designs of residential and office building complex ( B1.1-3, B2.1-3-B3A.1-3 ,B3A.4, B3B1-3) for non-profit and social housing in the GP 1 - settlement in the west of Dr. Ivana Ribara Street, New Belgrade
Realization: 2010

Technical verification of Final design for reconstruction of the building of the Ministry of Telecommunications and Information Society of the Republic of Serbia in 7, Pariska Street, Belgrade
Realization: 2010

Technical verification of Final design of residential and office building at PFC 1 in PFC 29, Block 63 along Vojvođanska Street, New  Belgrade
Realization: 2009

Technical verification of Final designs for heating installations in the building in 34, Nemanjina Street, Belgrade
Realization: 2009

Technical verification of Final designs of "Galenika" - new factory of solid pharmaceutical preparations in Zemun
Realization: 2008-2009

Technical verification of Final design of the office building of "Parking Service" Public Utility Company in 21, 27 Marta Street, Belgrade
Realization: 2008

Technical verification of Final design for Phase 1 of "Železnik" road tunnel on the South Belgrade Bypass and the Final designs for Phase 1  of construction of "Lipak" road tunnel on the South Belgrade Bypass
Realization: 2008

Technical verification of Final design of the General Staff building and restoration of facades in 33, Kneza Miloša Street, Belgrade 
Realization: 2007

Technical verification of Final design for reconstruction and extension of the building with underground garage in 9, Nemanjina Street
Realization: 2007

Technical verification of Final design for rehabilitation and remediation of the landfill in Novi Kneževac
Realization: 2007

Technical verification of Final designs of mechanical, electrical, traffic, water supply and sewerage installations and Final architectural and construction design and calculations in the field of civil engineering physics for Belville residential complex in Block 67, New Belgrade
Realization: 2007

Technical verification of designs for reconstruction of clinker transportation system in the "Titan" Cement Plant, Kosijerić
Realization: 2006

Technical approval of Preliminary design for Phase 2 of construction of " Makiš 2" water treatment plant
Realization 2005

Technical verification of Final designs of heating plant and hot water pipeline in the town of Valjevo 
Realization: 2005

Technical verification of Final designs of the plant powered by liquefied petroleum gas, "GANC" Hall, "Putnička" Beograd Division
Realization: 2005

Technical verification of Final designs of the plant for separation and selection of secondary raw materials from municipal waste on "Duboko" regional landfill, Užice
Realization: 2005 back