Print Page Print Page

Send to friend

Preliminary and Final designs of heating substations TP 52, TP 52A, TRZ24 and TRZ24A with related primary and secondary systems in Obrenovac

Realization: 2005 - 2006

box1
TP-52 and TP-52A: The design deals with connection of newly designed primary hot-water heating system to the existing main hot-water heating system, distribution pipeline from the primary hot-water heating system to external walls of heating substations TP-52 and TP-52A and distribution pipelines of the secondary hot-water heating system from heating substations to consumers. Distribution pipelines of primary and secondary hot-water heating systems shall be assembled of pre-insulated steel pipes TPZ24 and TPZ24A: The design deals with connection of newly designed primary hot-water heating system to the existing main hot-water heating system, distribution pipeline of the primary hot-water heating system to heating substations TPZ24 and TPZ24A, equipment in substations and  distribution pipelines of the secondary hot-water heating system from heating substations to consumers. Distribution pipeline of primary hot-water heating systems shall be assembled of pre-insulated steel pipes and the secondary hot-water heating system shall be assembled of pre-insulated plastic pipes. 

Heat capacity of each heating station is about 1 MW and total length of hot-water pipelines of each designed system of heating substations is about 1 km. Complete technical documentation also includes construction designs and reports on necessary geodetic surveying.

back