Final design for reconstruction and refurbishment of the Installation Depot (heating and ventilation) and Final design of heating and ventilation systems in the electrical engineering workshop (ETR) in Dorćol Complex of the Public Transport Company "Beograd"

Realization: 2007

box1
A hall of the Installation Depot shall be heated with hot water calorifiers (90/70°C). There will be installed calorifiers operating with circulating air and calorifiers operating with mix of fresh and circulating air.  Air shall be extracted from this areas through exhaust grilles, ducts and axial fans.

Extraction of supplied air will be performed through inspection pits in the Installation Depot. For better ventilation in the summer periods, air from the upper zone of the Depot will be extracted through exhaust grilles, ducts and axial fans as well. The electrical engineering workshop shall be ventilated by means of axial fans installed at places of old, defective fans. Radiator heating system shall be installed in the offices of both facilities. Facilities under reconstruction are supplied with heat energy from the existing boiler house within the Dorćol Complex of the Public Transport Company "Beograd".

back