Print Page Print Page

Send to friend

Final designs for reconstruction of "Juhorska 6" boiler house, Belgrade

Realization: 2012

"Juhorska 6" boiler house, which is integrated in the System of District Heating Plants of Belgrade, is located on Karaburma settlement in the cellar premises of residential and office building in Juhorska Street. The boiler house supplies with energy the building in 6, Juhorska Street and several buildings in the vicinity. The design envisages increase of heat source capacity i.e. installed capacity of boiler system, conversion of fuel from mazut to fuel oil and modernization of heat energy distribution system and related equipment for boiler system. Three hot water three-pass light fuel oil boilers, each of 1.1 MW capacity shall be installed so that total heat capacity of the boiler house will be 3.3 MW.

back