Preparation of the Final design for the rehabilitation of safety gate mechanism at pump stations GC1 and GC2, Novi Sad

Realization: 2009

Final design for the rehabilitation of safety gate mechanism at sewage pump stations GC1 and GC2 in Novi Sad includes electro-mechanical assembly of complete mechanism for gate lifting/lowering, new traverse for holding of complete mechanism and electrical cabinet for mechanism control. 

In the previous period a jack-screws moving gate vertically (up/down) used to be bent due to failure of end switches and switches for drive turning moments. 

The new mechanism includes all elements of required geometrical and mechanical characteristics that could be manufactured or repaired based on the delivered workshop documentation with rotary drive for control operation by "AUMA Reister Gmbh&Co.KG" Müllheim. 

Complete technical documentation includes electrical designs as well.