New tunnel designs

Realization: 2001 - 2008

During the period of 2001 to 2008, preliminary designs were prepared for the following tunnels: on the E-80 (Niš-Dimitrovgrad), the E-75 (Leskovac-border with FYRM), the E-763 (Belgrade-Požega-Boljare), the E-70 (bypasses around Belgrade and Pančevo), the inner ring road and the Beli Potok-Vinča-Pančevo bypass railway line. Designs were prepared for 30 tunnels, 31 000 m in total length.

Conceptual solution of the new road tunnels
Conceptual solution of the new road tunnels