Print Page Print Page

Send to friend

Designs of new tunnels

Realization: 2001 - 2008

During the period from 2001 to 2008, the Group for Tunnels and Special Structures was engaged in preparation of preliminary designs for tunnels on the following routes: E-80 highway (Niš-Dimitrovgrad), E-75 highway (Leskovac-border with FYRM), E-763 highway (Belgrade-Požega-Boljare), E-70 highway (bypass around Belgrade and Pančevo), Inner Ring Road and Beli Potok-Vinča-Pančevo bypass railway line. Designs were prepared for 30 tunnels 31 000 m long in total.

back