Print Page Print Page

Send to friend

Final Design for reconstruction of Jurija Gagarina Street, New Belgrade

Realization: 2005

The design referred to 500 m long street with 6 traffic lanes and new bridge, 188 m long.

Inter-connection of the completed street segments was enabled by introducing the new reinforced concrete bridge and displacing the existing tram line to obtain the adequate profile of the street.