Print Page Print Page

Send to friend

Preliminary and Final designs for city arterials in Prijepolje together with bridge over the Lim River

Realization: 2006 - 2007

The design referred to both new arterials and the existing ones planned for improvement.

The design also included construction of 100 m long bridge over the Lim River to enable more efficient inter city connections, left and right river banks including approach to bus and railway stations and connection to the M.21 Main Road.

back