Print Page Print Page

Send to friend

Preliminary and Final designs for reconstruction of Konstantin the Great Boulevard in Sremska Mitrovica

Realization: 2006 - 2007

The design referred to reconstruction of Konstantin the Great Boulevard, 1.45 km long with 4 traffic lanes, 2 footways, 2 cycle tracks with parking lots.

The design also included construction of 1 roundabout. The purpose of the design is improvement of both traffic flow and safety.

back