Print Page Print Page

Send to friend

Preliminary and Final designs of Savska Street in Belgrade

Realization: 2007 - 2008

The design was developed for 900 m long street with 5 traffic lanes and 2 footways (phase 1),  i.e. 6 traffic lanes and 2 footways (phase 2). The purpose of the design was to improve traffic flow and safety together with technical characteristics of the street.

The design also included reconstruction of tram railway line and OCS along the entire street length. Design referring to irrigation of tramway track area was also developed. Replacement of all technical installations in the road bed was also planned.

back