Print Page Print Page

Send to friend

Preliminary and Final designs of Vršac-Markovac-Romanian Border Road

Realization: 2007 - 2008

Works on the existing road included widening of the present carriageway (6.50 m) as well as construction of the new alignment in the length of 20.4 km, fully in accordance with the design.

All intersections with the present roads are at grade, as specified in the design.

back