Print Page Print Page

Send to friend

General, Preliminary and Final designs for Vršac by-pass road, from Belgrade-Vršac M1.9 (E-70) Main Road to connection with Vršac-Vatin M1.9 (E-70) Main Road

Realization: 2007 - 2009

This 7.9 km long road with 2 traffic lanes is designed for the speed of 100 km/h.

According to the design herein, traffic toward Romania is directed around the city. The road is also provided with 2 grade-separated junctions.

The road surfacing occupies about 87,820 m2 in area, and 496,000m3 of material was used for the embankment construction.

back