Print Page Print Page

Send to friend

Preliminary Design of the new Avala Road together with accompanying infrastructure

Realization: 2008 - 2009

This 4.4 km long road with 4 traffic lanes is designed for the speed of 70 km/h.

The design also included "Topola", "Rakovica" and "Razbojište" tunnels, together with 3 bridges and at-grade intersections as well as engineering structures required for securing of the road bed.

back