Roads

Preliminary Design of the new Avala Road together with accompanying infrastructure

This 4.4 km long road with 4 traffic lanes is designed for the speed of 70 km/h ...

read more

Preliminary and Final designs of Vršac-Markovac-Romanian Border Road

Works on the existing road included widening of the present carriageway (6.50 m) as well as construction of the new alignment in the length of 20.4 km, fully in accordance ...

read more

General and Preliminary designs of Kikinda by-pass road

This 14.5 km long road with 2 traffic lanes is designed for the speed of 100 km/h ...

read more

Final Design for improvement of R-201a, class 2 road; Ralja-Parcanski Vis Section

The design included improvement of technical characteristics of the road and rehabilitation of pavement to provide better integrity, durability and bearing capacity of the ...

read more

Final design for reconstruction of Jovanjica Dock- Hilandar Monastery, Holy Mountain, Greece

The design included improvement of technical characteristics of the road and rehabilitation of the pavement to provide better integrity, durability and bearing capacity of ...

read more