General Design and Pre-Feasibility Study of the E-763 Highway, Sector 3: Požega – Border with Montenegro

Realization: 2006 - 2007

The design refers to the section 106.0 km long that is composed of 4 traffic lanes, 2 emergency lanes and central reserve for the speed varying from 100 km/h to 120 km/h.

40% of the future highway alignment is planned to be routed through tunnels and on-bridges.

Therefore, the design also includes 97 bridges having the total length of 27 km, 58 tunnels with the total length of 19 km and 4 grade-separated junctions (Požega, Arilje, Ivanjica and Duga Poljana).