Print Page Print Page

Send to friend

Modification of Preliminary Design for the E-75 Highway, from Srpska Kuća to Levosoje

Realization: 2009 - 2010

This section, 8.1 km long, with 4 traffic lanes, 2 emergency lanes, and central reserve is designed to support the speed of 120 km/h. The existing M1 Main Road is planned to be reconstructed and widened to serve as a carriageway of the future highway.

Within Donji Neradovac-Srpska Kuća Section, 27 reinforced concrete continuous and simple beam bridges are designed. Prestressed girders are 35 m long.

The longest bridge is 250 m long.

back