Print Page Print Page

Send to friend

Final Design of the E-80 Highway, Sukovo-Dimitrovgrad Section

Realization: 2009 - 2010

The section, 8.3 km long, with 4 traffic lanes, 2 emergency lanes, and central reserve is designed to support the speed of 120 km/h.

The design also includes 205 m long tunnel and 9 bridges as well as installation of noise protection barriers.

back