Print Page Print Page

Send to friend

Final Design of the E-763 Highway, Ub-Lajkovac Section

Realization: 2009 - 2010

This section, 12.5 km long, with 4 traffic lanes, 2 emergency lanes, and central reserve is designed to support the speed of 130 km/h.

The design also includes ''Lajkovac'' grade-separated junction and 13 bridges out of which 4 are longer than 100 meters.

In addition, the design also includes 2 rest areas together with parking lots for passenger and freight vehicles and accompanying infrastructure capacities.

back