Print Page Print Page

Send to friend

Final Design of the E-80 Highway, Crvena Reka – Čiflik Section

Realization: 2011

This section that integrates the E-80 Highway is 2.37km long and designed for the speed of 120 km/h. The section has 4 traffic lanes, 2 emergency lanes and the central reserve.

This section runs through the valley of Nišava River and follows the Niš-Dimitrovgrad Railway Line and the existing M1.12 National Road, class 1. At the very end, the section runs over the М1.12 National Road and extends to Čiflik- Staničenje Section.

The section will have one bridge over Nišava River, the railway line and two underpasses. Pavement runoffs shall be adequately treated prior to releasing into any recipients.

back