Print Page Print Page

Send to friend

Final Design of the E-75 Highway, Gornje Polje-Caričina Dolina Section

Realization: 2011

The subject of the Final Design is Gornje Polje-Caričina Dolina Section, segment of the E-75 Highway, from Leskovac (Grabovnica) to the border with FYR Macedonia. The 11.8 km long highway section with 4 traffic lanes, 2 emergency lanes and central reserve that runs through hilly-mountainous terrain is designed to support the speed of 100 km/h.

The studied corridor also includes the existing arterials:  M-1 national road, class 1, Niš- Skoplje railway line, and R-214 national road, class 2. The ''Predejane'' Tunnel, 1000 m long, and ''Predejane'' interchange enable link between local roads and the highway.

This section also includes 26 bridges, engineering structures and noise protection barriers.

box1
Layout of the E-75 Highway, Gornje Polje- Caričina Dolina Section
Layout of the E-75 Highway, Gornje Polje- Caričina Dolina Section

back