Print Page Print Page

Send to friend

General, Preliminary and Final designs for reconstruction and widening of Batrovci Border Crossing on the E-70 highway, phases 1 and 2

Realization: 2004 - 2005

Reconstruction, widening and modernization of the studed border crossing included execution of traffic, technological, architectural, town planning and similar works together with introduction of adequate accompanying facilities and equipment, as specified in the design. The result was improved and more functional border crossing with 17 traffic lanes that meet all users needs and provide safe and minimum wait times.

Works on reconstruction and modernization of the border crossing complex on the E-70 Highway, between the Republic of Serbia and the Republic of Croatia, enabled widening and improvement of areas, contents and structures and their grouping into functional entities/terminals accompanied with all technical and technological infrastructural elements and equipment required.

box1

back