Print Page Print Page

Send to friend

General design for reconstruction and modernization of Batajnica-Golubinci-Šid-Croatian border railway line

Realization: 2005 – 2007

The design deals with both reconstruction and modernization of 100 km long Batajnica-Golubinci-Šid-Croatian border railway line which is an integrating segment of the Corridor X. The line is planned to support the speed of 160 km/h maximum.

back