General design for construction of private siding from Kostolac B Thermal Power Plant to the existing railway line

Realization: 2009 – 2010

The design defines technical and technological solutions for construction of non-electrified private siding from Kostolac B Thermal Power Plant to the existing railway line. The open track is 15 km long while the siding inside Kostolac TPP Complex is 6 km long, meaning that the total length of the track is 21 km. The design also included placement of 16 switches. The design parameters support the speed of 50 km/h on the open track, i.e. 20 km/h on the section inside the Thermal Power Plant Complex.