Print Page Print Page

Send to friend

Final design for rehabilitation of tramway tracks and OCS in Dr Ivana Ribara Street, from Jurija Gagarina Street to the tramway loop on the Sava Embankment

Realization: 2008 – 2009

The prepared technical documentation included as follows: geotechnical documentation for the final design level, preliminary and final civil engineering designs for the substructure and permanent way, pavement, sidewalks, parking lots, sewage network, OCS reconstruction, control and heating of points, traffic signaling and equipment, lighting system, protection of hot water pipeline and cathodic protection. In addition, the design documentation also included the geodetic setting out design, work methodology design and tender documents.

The studied section runs from Jurija Gagarina Street, along Dr Ivana Ribara Street to the tramway loop on the Sava embankment. The design herein also includes tramway loop as well as intersection with Jurija Gagarina Street.

The planned rehabilitation works were performed on right track (660 m), left track (606 m), 240 m (loop right track) and loop left track (211 m), which made the overall length of 1702 m.

Works included complete replacement of substructure and permanent way and erection of the new OCS.

back