Print Page Print Page

Send to friend

General design of the new road bridge over the Danube River in Novi Sad that follows the alignment of the former railway line

Realization: 2007

This road bridge over the Danube River with the tunnel under Petrovaradinska Fortress is supported by piers of the old railway bridge. 

The continuous steel construction is relieved above the navigable clearance by applying sole arch in the bridge axis. The bridge is 23.8 m wide and 523 m long.

back