Final design of rehabilitation and trial loading of the road-railway ’’PANČEVAČKI BRIDGE’’ over the Danube River together with approach structures

Realization: 2007

The steel construction is continuous girder with 5 spans, 809 m long in total. The approach structures on Pančevo side are composite steel constructions, while on Belgrade side these are pre-stressed concrete structures planned for road traffic operations.