Print Page Print Page

Send to friend

Preliminary design of the second track, Belgrade Center-Pančevo Glavna-Vršac-National Border Railway Line, new railway bridge over the Tamiš River

Realization: 2009

Steel truss construction, 80 m in span, with five composite structures each having 32.0 m in span. Piers were founded on piles.

back