Print Page Print Page

Send to friend

Final design of the railway bridge at km 41+061, Subotica-Bogojevo-National Border Railway Line

Realization: 2006

The steel truss construction of the bridge is composed of seven simple beams having the span of L=5x102.0+66.0+35.1 in total. The damaged end structure of the bridge was successfully reconstructed.

box1

back