Final rehabilitation design of the railway bridge over the Sava River at km 5+260, Ostružnica-Batajnica Railway Line

Realization: 2005

The bridge is composed of 10 approach concrete structures having 27 m in span and 4 truss simple beams, 95.5 m in span. The bridge is 658 m long. During the NATO bombing, one approach structure was destroyed as well as one steel construction, while the pier supporting the truss system suffered heavy damages. However, the bridge was reconstructed and reopened for traffic.