Print Page Print Page

Send to friend

Competition design for the Bridge over the Danube River in Novi Sad

Project implementation year: 2008

Approaching continuous structure of span length L=40+60+40=140m. Central continuous structure over the river of span length L=91.73+188.3+84.75=364.78m. Simple beam constructions of 18.45 m span length on the river bank above Kamenički road. Bridge structures at "Kejžrtavaracije" interchange.

back